Mango Leaf
Mango Leaf is a residential project by Kakatiya Infra Projects Private Limited(opc) in Rc Puram, Sangareddy district, Telangana. It is registered with the Telangana RERA as P01100000703 (status: On-Going Project). The approving authority named in the filing is HMDA. The promoter filed a total site area of 10,118 sq m (2.5 acres) and 27 buildings on the approved plan. The proposed date of completion is 22/03/2023.
Description
Mango Leaf is a residential villa project in Kollur. The TG-RERA filing records 27 units on 10,117.51 sq m of land and lists the project as ongoing, with a proposed completion date of 22 March 2023.
- Project type
- Residential (villa)RERA filing
- Units
- 27RERA filing
- Towers
- 1nobroker
- Land area
- 10117.51 sq mRERA filing
- Possession
- 22/03/2023RERA filing
- Status
- On-Going ProjectRERA filing
Gallery


Configurations & sizes
The approved floor-plan drawings show 1BHK layouts with measured carpet areas from 90.5 to 137.9 sq m; this is a drawing-based measurement, not a RERA disclosure, and should be verified against the drawings. The TG-RERA filing records 27 3BHK units, with 0 booked, and a saleable area of 207.43 sq m.
| Type | Carpet | Built-up | Saleable | Plot | Source |
|---|---|---|---|---|---|
| 3BHK | 1194 sqft. | 1493 sqft. | 207.43 sq m | RERA filing | |
| 195 sq.yard | 283.79 sq.m (3054sft) | 195 sq.yard | Developer site | ||
| 211 sq.yard | 250.40 sq.m (2698sft) | 211 sq.yard | Developer site | ||
| 240 sq.yard | 321.74 sq.m (3463sft) | 240 sq.yard | Developer site | ||
| 3BHK villa | Developer site | ||||
| 4/5 bhk | Developer site | ||||
| triplex villas | Developer site |
Amenities
The project’s listed amenities include shared recreational and community facilities, alongside residential infrastructure.
- Green Strip/TOT LOT/Park
- Community Buildings
- Visitor parking
- 24*7 Security
- Lift-Lobby Parking
- Vastu Friendly
- Cafeteria
- Waste Compost Garden
- Fire Fighting Equipment
- Intercom Network
- Cycling Track
- Gas Connection
- BonFire
- Camping
- Earthquake Resistance
- Door step delivery
- In Room Dinning
- Kids Playing Area
- Medical Service
- Naturopathy
- Table Tennis
- Transportation On Call
- Seating plazas
- Party lawns
- Fitness stations
- clubhouse
- sports facilities
- Wide Driveways
- Children Play Area
- Water Cascades
- all other sports facilities
- Vastu Compliant
- Maintenance Staff
- Waste Management
- Cricket Pitch
- Intercom
- CCTV Camera
- Power Backup
- Swimming Pool
- Gym
- Children's Play Area
- Covered car parking
Specifications
- Construction
- Bricks cement in Aditya birla flyash
- Electrical
- Concealed wiring with PVC Insulated copper wires of reputed make. Modular switches of reputed make sufficient power outlets and light points. Individual earthing system.
- Entrance Doors
- Teak wood frame with 4'0'' wide paneled single shutter with 8' ht in Teak wood timber with melamine polishing
- Internal Doors
- Hardwood timber frames and flush shutters 8' ht with a natural veneer finish
- Windows
- uPVC Frames sliding glass doors and casement windows. Fixed windows. Sliding windows and top Hung Windows of Premium Make hardware of windows superior quality brush finished stainless steel and single glazed unit with clear glass
Location & connectivity
The project is in Kollur Village, RC Puram mandal, Sangareddy district. Nearby destinations and distances are not listed.
Promoter
The promoter is KAKATIYA INFRA PROJECTS PRIVATE LIMITED(OPC), a private limited company, with one other registered project. Its official website is kakatiyainfra.com; the named architect is PAVAN KUMAR and the structural engineer is NASEER ALI.
Additional details
- Telangana State Real Estate Regulatory Authority (RERA)
- MANGO LEAF EXTENSION TS RERA Project Registration No: P01100000663
- HDFC
- ICICI
- SBI
Filed vs marketed
The TG-RERA filing records 27 units, while marketing sources state 79 or 80 villas; the filing gives a proposed completion date of 22/03/2023, while NoBroker lists September 2025, and NoBroker shows 6.8 acres whereas its marketed land-area figure is 6.90 acres.
- Total units: nobroker says 79; the RERA filing says 27. nobroker
- Total villas: The developer’s site says 80 Villas; the RERA filing says 27. Developer site
- Possession: nobroker says September 2025; the RERA filing says 22/03/2023. nobroker
- Land area: nobroker says 6.90 Acres; we show 6.8 Acres. nobroker
Sources & web results
- P01100000703, Hyderabad - Kakatiya Mango Leaf Extsquareyards.com
- nobroker.in
- MANGO LEAF Ranga Reddy – RERA No. P01100000703aurumproptech.in
- 99acres.com
- Kakatiya Mango Leaf, Kollur, Hyderabad | 4 & 5 BHK Ultra ...houssed.com
- MANGO LEAF | 3BHK | Kollur | Photos & Reviewsbhumiboss.com
- MANGO LEAF (Telangana) Report & Status | Real Estate Reportsrealestatereports.in
- 📑 Lets Emb k on a Beautiful Jo ney of fine living!
- 📑 Floor Plan - mango leaf
- 📑 mango leaf
- 📑 Benefits of Mango Leaf Water | PDF
- 📑 Mango Leaf Adaptations Explained | PDF
- 📑 Study On Mango Leaf and Mangiferin | PDF
- 📑 Mango Leaf Tea's Impact on Diabetes | PDF
Public RERA registration record
Telangana RERA, as filed by the promoter.
- Registered name
- MANGO LEAF
- Developer / Promoter
- KAKATIYA INFRA PROJECTS PRIVATE LIMITED(OPC)
- Project type
- Residential
- RERA Registration No.
- P01100000703
- Registration Status
- On-Going Project
- Approved on
- 22/03/2018
- Proposed completion
- 22/03/2023
- Approving authority
- HMDA
- Total site area
- 10,118 sq m (2.5 acres)
- Approved built-up area
- 5,616 sq m (1.4 acres)
- Buildings (approved plan)
- 27
- Locality
- RC PURAM, KOLLUR
- Mandal
- RC PURAM
- District
- Sangareddy
- PIN code
- 533255
- Documents on File
- 15
Frequently asked questions
Is MANGO LEAF registered with Telangana RERA?
Yes. MANGO LEAF is registered with the Telangana Real Estate Regulatory Authority as P01100000703; the registration status is On-Going Project.
Who is the developer of MANGO LEAF?
The promoter named in the RERA registration is KAKATIYA INFRA PROJECTS PRIVATE LIMITED(OPC).
Where is MANGO LEAF located?
MANGO LEAF is in RC PURAM, KOLLUR, Sangareddy, Telangana (533255).
When will MANGO LEAF be completed?
The promoter's proposed date of completion filed with RERA is 22/03/2023. This is the promoter's declaration, not a guarantee.