Onecent Orchard
Onecent Orchard is a residential project by Onecent Homes Private Limited in Tkr College Near, Saroornagar, Rangareddy district, Telangana. It is registered with the Telangana RERA as P02400004346 (status: New Project). The approving authority named in the filing is GHMC (plan approval 0358/GHMC/LBN/2022-BP). The promoter filed a total site area of 397 sq m and 1 building on the approved plan. The proposed date of completion is 28/02/2025.
More from Onecent Homes Pvt Ltd · 3 projects →
Description
Onecent Orchard is a residential apartment project with 10 units in one tower of five floors on a 397.15 sq m site. It is registered with TG-RERA as a new project, with completion proposed for 28 February 2025.
- Project type
- Residential (apartment)RERA filing
- Units
- 10RERA filing
- Towers
- 1RERA filing
- Floors
- 5RERA filing
- Land area
- 397.15 sq mRERA filing
- Possession
- 28/02/2025RERA filing
- Status
- New ProjectRERA filing
Gallery


Configurations & sizes
For the 3BHK configuration, carpet area measured from the approved floor-plan drawings is not available; the measurement record lists no measured flat designs. The TG-RERA filing records 10 units, 0 bookings and a saleable area of 70.61 sq m per unit.
| Type | Saleable | Source |
|---|---|---|
| 3BHK | 70.61 sq m | RERA filing |
Amenities
The project’s disclosed amenities include recreation and resident facilities, alongside listed site infrastructure.
- 24/7 security
- Living space
- Parking area
- Security features
- Kids playzone
- Landscaped avenue
- Power Backup
- Visitor parking
- swimming pool
- gym
- children's play area
- clubhouse
- covered car parking
Specifications
- doors
- Teakwood entrance frame with polished shutter
- electrical
- Modular switches and multi-strand copper wiring; TV points in living room and bedrooms
- elevation
- glass-forward elevation
- flooring
- Ceramic tile flooring across apartments
- kitchen
- Sadarahalli granite kitchen platform with stainless steel sink
- masonry
- Solid concrete blocks for masonry
- power backup
- Generator backup with automatic load controller
- structure
- RCC frame structure using ready-mix concrete and high-carbonized steel; solid concrete blocks for masonry
Location & connectivity
The project is in Karmanghat, within Saroornagar mandal, Ranga Reddy district. The developer identifies its location as Karmanghat, Hyderabad.
Promoter
The promoter is ONECENT HOMES PRIVATE LIMITED, a private limited company with two other registered projects. Its official website is onecent.homes; the named architect is K RAVI and the structural engineer is C H SAI KRISHNA.
Additional details
- HDFC
- ICICI
- SBI
Sources & web results
- ONECENT ORCHARD Ranga Reddyaurumproptech.in
- Onecent Orchard in Saroornagar, Hyderabadhousing.com
- ONECENT ORCHARD (Telangana) Report & Status | Real Estate ...realestatereports.in
- Onecent Orchard Saroor nagar, Hyderabad99acres.com
- ONECENT ORCHARD | 3BHK | Karmanghatbhumiboss.com
Public RERA registration record
Telangana RERA, as filed by the promoter.
- Registered name
- ONECENT ORCHARD
- Developer / Promoter
- ONECENT HOMES PRIVATE LIMITED
- Project type
- Residential
- RERA Registration No.
- P02400004346
- Registration Status
- New Project
- Approved on
- 28/02/2022
- Proposed completion
- 28/02/2025
- Approving authority
- GHMC
- Plan approval no.
- 0358/GHMC/LBN/2022-BP
- Total site area
- 397 sq m
- Approved built-up area
- 1,211 sq m (0.3 acres)
- Buildings (approved plan)
- 1
- Locality
- TKR COLLEGE NEAR, Karmanghat
- Mandal
- Saroornagar
- District
- Rangareddy
- PIN code
- 500079
- Documents on File
- 11
Frequently asked questions
Is ONECENT ORCHARD registered with Telangana RERA?
Yes. ONECENT ORCHARD is registered with the Telangana Real Estate Regulatory Authority as P02400004346; the registration status is New Project.
Who is the developer of ONECENT ORCHARD?
The promoter named in the RERA registration is ONECENT HOMES PRIVATE LIMITED.
Where is ONECENT ORCHARD located?
ONECENT ORCHARD is in TKR COLLEGE NEAR, Karmanghat, Saroornagar, Rangareddy, Telangana (500079).
When will ONECENT ORCHARD be completed?
The promoter's proposed date of completion filed with RERA is 28/02/2025. This is the promoter's declaration, not a guarantee.