thePropCheck AI property due diligence
Sign in

Bhavanas Glc Cribs Phase 3

Bhavanas Glc Cribs Phase 3 is a residential project by Lakshmi Srinivasa Constructions in Dundigal, Dundigal Gandimaisamma, Medchal-Malkajgiri district, Telangana. It is registered with the Telangana RERA as P02200002242 (status: New Project). The approving authority named in the filing is HMDA (plan approval 000283/LO/Plg/HMDA/2). The promoter filed a total site area of 4,932 sq m (1.2 acres) and 30 buildings on the approved plan. The proposed date of completion is 20/09/2025.

More from Lakshmi Srinivasa Constructions · 3 projects →

🔒 Title & legal checks
Title and legal checks are available for this project.
To see the full title details and any court records, please sign in

Description

Bhavanas GLC Cribs Phase 3 is a residential villa project recorded as a New Project with TG-RERA. The filing records 30 units across 30 villa blocks on 4,932.45 sq m of land, with proposed completion on 20 September 2025.

Project type
Residential (villa)RERA filing
Units
30RERA filing
Land area
4932.45 sq mRERA filing
Possession
20/09/2025RERA filing
Status
New ProjectRERA filing
Photo from housing.com

Configurations & sizes

The project has 3BHK villas; carpet area measured from the approved drawings is not available because the drawings were not measured. The TG-RERA filing records 30 units, 0 booked, and a saleable area of 124.96 sq m per unit.

TypeBuilt-upSaleableSource
3BHK1,271 - 1,350 sq ft124.96 sq mRERA filing

Amenities

Filed and marketed information describes shared infrastructure and open-space amenities.

8 amenities
  • Green Strip/TOT LOT/Park
  • Community Buildings
  • Aggregate area of recreational Open Space
  • landscaping & tree planting
  • open parking
  • recreational open space
  • receiving station
  • electrification

Location & connectivity

The project is in Dundigal village, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district, PIN 501401. Mallampet X Roads is 1.18 km away, Mallampet X Roads Bus Stop is 1.20 km away, and Bharat Petroleum is 1.55 km away.

Dundigal, Dundigal Gandimaisamma, Medchal-Malkajgiri
📍 Open in Maps

Promoter

The promoter is LAKSHMI SRINIVASA CONSTRUCTIONS, recorded as a partnership. The promoter has 2 other registered projects; the named architect is Mounika Erukula and the structural engineer is Damodhar Reddy.

LAKSHMI SRINIVASA CONSTRUCTIONS
2 other projects on record

Filed vs marketed

The RERA filing gives the locality as DUNDIGAL, while the developer’s marketing lists Mallampet, Hyderabad.

  • Locality: housing says Mallampet, Hyderabad; the RERA filing says DUNDIGAL. housing
The RERA filing is the legally binding record.

Sources & web results

Fallback
Property portals
Published by third parties — verify before relying on them.

Public RERA registration record

Telangana RERA, as filed by the promoter.

Registered name
BHAVANAS GLC CRIBS PHASE 3
Developer / Promoter
LAKSHMI SRINIVASA CONSTRUCTIONS
Project type
Residential
RERA Registration No.
P02200002242
Registration Status
New Project
Approved on
20/09/2019
Proposed completion
20/09/2025
Approving authority
HMDA
Plan approval no.
000283/LO/Plg/HMDA/2
Total site area
4,932 sq m (1.2 acres)
Approved built-up area
3,749 sq m (0.9 acres)
Buildings (approved plan)
30
Locality
DUNDIGAL
Mandal
Dundigal Gandimaisamma
District
Medchal-Malkajgiri
PIN code
501401
Documents on File
9

Other registrations of Bhavanas Glc Cribs

Frequently asked questions

Is BHAVANAS GLC CRIBS PHASE 3 registered with Telangana RERA?

Yes. BHAVANAS GLC CRIBS PHASE 3 is registered with the Telangana Real Estate Regulatory Authority as P02200002242; the registration status is New Project.

Who is the developer of BHAVANAS GLC CRIBS PHASE 3?

The promoter named in the RERA registration is LAKSHMI SRINIVASA CONSTRUCTIONS.

Where is BHAVANAS GLC CRIBS PHASE 3 located?

BHAVANAS GLC CRIBS PHASE 3 is in DUNDIGAL, Dundigal Gandimaisamma, Medchal-Malkajgiri, Telangana (501401).

When will BHAVANAS GLC CRIBS PHASE 3 be completed?

The promoter's proposed date of completion filed with RERA is 20/09/2025. This is the promoter's declaration, not a guarantee.

More projects in Dundigal