Sri Laxminarasimha Swamy Venture Phase 2
Sri Laxminarasimha Swamy Venture Phase 2 is a plotted development project by Masula Narsimulu in NARAYANAPET District kosagi, Kosgi, Mahabubnagar district, Telangana. It is registered with the Telangana RERA as P01400007163 (status: New Project). The approving authority named in the filing is DTCP. The promoter filed a total site area of 18,642 sq m (4.6 acres). The proposed date of completion is 14/09/2025.
Description
The project is a plotted development with a RERA-filed land area of 18,642 sq m. The TG-RERA status is listed as New Project, with proposed completion on 14 September 2025.
- Project type
- Plotted DevelopmentRERA filing
- Land area
- 18642 sq mRERA filing
- Possession
- 14/09/2025RERA filing
- Status
- New ProjectRERA filing
Configurations & sizes
The approved layout drawings show plots, with measured areas ranging from 116.95 to 290.38 sq m; these measurements are read from the drawings, not disclosed by RERA, and should be verified. The TG-RERA filing does not disclose unit counts, bookings or saleable areas for configurations; the developer advertises plot sizes of 1,249–3,122 sq ft as built-up area.
| Type | Built-up | Source |
|---|---|---|
| 3 & 4 BHK | aurumproptech | |
| plot | 1,249 - 3,122 sq ft | aurumproptech |
Amenities
The project disclosures describe open-space and park areas alongside infrastructure such as internal roads, water supply and storm-water drains.
- Green Strip/TOT LOT/Park
- Aggregate area of recreational Open Space
- Aggregate area of recreational
- Open Space
- fire sprinklers
- full power backup
- recreational open space
- landscape garden and tree planting
Location & connectivity
The project is listed at NARAYANAPET District kosagi, PIN 509339, in Kosgi village, Kosgi mandal, Mahabubnagar district.
Promoter
The TG-RERA filing names MASULA NARSIMULU as promoter. The promoter's entity type, count of other registered projects, official website and named architect or engineer are not provided in the displayed project overview data.
Filed vs marketed
The RERA filing lists the locality as NARAYANAPET District kosagi, while the developer's marketing lists it as Mahabubnagar, Hyderabad.
- Locality: aurumproptech says Mahabubnagar, Hyderabad; the RERA filing says NARAYANAPET District kosagi. aurumproptech
Sources & web results
- Sri Laxminarasimha Swamy Venture Phase 1proptiger.com
- Master plan of Sri Laxminarasimha Swamy Venture Phase 1housing.com
- Sri Laxminarasimha Swamy Venture Phase 1aurumproptech.in
- Sri Laxminarasimha Swamy Venture Phase ...housing.com
- Sri Laxminarasimha Swamy Venture Phase 1 - Narayanpethousing.com
- Sri Laxminarasimha Swamy Venture Phase 2, Narayanpetprophunt.ai
- Sri Laxminarasimha Swamy Venture Phase 2 Mahabubnagar ...ghar.tv
Public RERA registration record
Telangana RERA, as filed by the promoter.
- Registered name
- SRI LAXMINARASIMHA SWAMY VENTURE PHASE 2
- Developer / Promoter
- MASULA NARSIMULU
- Project type
- Plotted Development
- RERA Registration No.
- P01400007163
- Registration Status
- New Project
- Approved on
- 15/09/2021
- Proposed completion
- 14/09/2025
- Approving authority
- DTCP
- Total site area
- 18,642 sq m (4.6 acres)
- Approved built-up area
- 10,435 sq m (2.6 acres)
- Locality
- NARAYANAPET District kosagi, Kosgi(SC Kosgi-A)
- Mandal
- Kosgi
- District
- Mahabubnagar
- PIN code
- 509339
- Documents on File
- 12
Frequently asked questions
Is SRI LAXMINARASIMHA SWAMY VENTURE PHASE 2 registered with Telangana RERA?
Yes. SRI LAXMINARASIMHA SWAMY VENTURE PHASE 2 is registered with the Telangana Real Estate Regulatory Authority as P01400007163; the registration status is New Project.
Who is the developer of SRI LAXMINARASIMHA SWAMY VENTURE PHASE 2?
The promoter named in the RERA registration is MASULA NARSIMULU.
Where is SRI LAXMINARASIMHA SWAMY VENTURE PHASE 2 located?
SRI LAXMINARASIMHA SWAMY VENTURE PHASE 2 is in NARAYANAPET District kosagi, Kosgi(SC Kosgi-A), Kosgi, Mahabubnagar, Telangana (509339).
When will SRI LAXMINARASIMHA SWAMY VENTURE PHASE 2 be completed?
The promoter's proposed date of completion filed with RERA is 14/09/2025. This is the promoter's declaration, not a guarantee.