Csr Mithila
Csr Mithila is a residential project by Arenu Constructions LLP in Korremula, Ghatkesar, Medchal-Malkajgiri district, Telangana. It is registered with the Telangana RERA as P02200009044 (status: New Project). The approving authority named in the filing is HMDA. The promoter filed a total site area of 2,225 sq m (0.5 acres) and 1 building on the approved plan. The proposed date of completion is 21/12/2029.
Description
CSR MITHILA is a residential apartment project recorded as a New Project under TG-RERA. The filing describes a 35-unit development in one tower, with five floors on 2,225.30 sq m of land, and gives 21 December 2029 as the proposed completion date.
- Project type
- Residential (apartment)RERA filing
- Units
- 35RERA filing
- Towers
- 1RERA filing
- Floors
- 5RERA filing
- Land area
- 2225.30 sq mRERA filing
- Possession
- 21/12/2029RERA filing
- Status
- New ProjectRERA filing
Gallery


Configurations & sizes
For 2BHK homes, carpet area measures 73.1–75.2 sq m from the approved drawings; this is a drawing-based measurement, not a RERA disclosure, and should be verified against the drawings. The TG-RERA filing records 15 units, none booked, with saleable area of 105.53 sq m. For 3BHK homes, carpet area measures 78.8–95.8 sq m from the approved drawings; this is a drawing-based measurement, not a RERA disclosure, and should be verified against the drawings. The filing records 20 units, none booked, with saleable area of 110.64–143.83 sq m.
| Type | Built-up | Saleable | Source |
|---|---|---|---|
| 3BHK | 1,136 - 1,548 sq ft | 110.64–143.83 sq m | RERA filing |
| 2BHK | 1,136 - 1,548 sq ft | 105.53 sq m | RERA filing |
| 2BHK+2T | 1136 sq ft | proptiger | |
| 3BHK+3T | 1191 sq ft | proptiger |
Amenities
The developer lists a tot-lot and project infrastructure including water supply, sewerage and rainwater harvesting.
- Tot-Lot Area 1430.00 SFT
Location & connectivity
The project is in Korremula Village, Ghatkesar Mandal, Medchal-Malkajgiri district. The developer lists Hyderabad–Warangal Highway at 1 KM, Uppal Metro Station at 10 KM, and Ghatkesar ORR Exit at 6 KM.
- Hyderabad - Warangal Highway1 KM
- Uppal Metro Station10 KM
- Ghatkesar ORR Exit6 KM
Promoter
The promoter is ARENU CONSTRUCTIONS LLP, an LLP, and its official website is arenuconstructions.com. The named architect is DAYANAMAINA MAHESH and the structural engineer is Nasseerr Ur Tahaman.
Additional details
Filed vs marketed
Proptiger.com shows the land area as 2661.99 sq yards (or 2225.76 sq m), while its marketing also states 0.549 acres.
- Land area: proptiger says 0.549 Acres; we show 2661.99 Sq. Yards (OR) 2225.76 Sq. Meters. proptiger
Sources & web results
- Arenu CSR Mithila in Korremula, Hyderabadproptiger.com
- Arenu CSR Mithila in Korremula, Hyderabadhousing.com
- CSR MITHILA Ranga Reddy – RERA No. P02200009044aurumproptech.in
- Arenu CSR Mithila Korremula , Hyderabad99acres.com
- Arenu CSR Mithila Korremula, Hyderabadrathiglobalrealty.com
- Arenu CSR Mithila FAQs - Korremula , Hyderabad99acres.com
- Arenu Constructions LLP CSR Mithila in Korremula, ...aurumproptech.in
Public RERA registration record
Telangana RERA, as filed by the promoter.
- Registered name
- CSR MITHILA
- Developer / Promoter
- ARENU CONSTRUCTIONS LLP
- Project type
- Residential
- RERA Registration No.
- P02200009044
- Registration Status
- New Project
- Approved on
- 21/08/2023
- Proposed completion
- 21/12/2029
- Approving authority
- HMDA
- Total site area
- 2,225 sq m (0.5 acres)
- Approved built-up area
- 4,128 sq m (1.0 acres)
- Buildings (approved plan)
- 1
- Locality
- Korremula, Korremula
- Mandal
- Ghatkesar
- District
- Medchal-Malkajgiri
- PIN code
- 500088
- Documents on File
- 14
Frequently asked questions
Is CSR MITHILA registered with Telangana RERA?
Yes. CSR MITHILA is registered with the Telangana Real Estate Regulatory Authority as P02200009044; the registration status is New Project.
Who is the developer of CSR MITHILA?
The promoter named in the RERA registration is ARENU CONSTRUCTIONS LLP.
Where is CSR MITHILA located?
CSR MITHILA is in Korremula, Ghatkesar, Medchal-Malkajgiri, Telangana (500088).
When will CSR MITHILA be completed?
The promoter's proposed date of completion filed with RERA is 21/12/2029. This is the promoter's declaration, not a guarantee.