Green Pinnacle Block-C
Green Pinnacle Block-C is a residential project by Kuna in Quthbullapur, Qutballapur, Medchal-Malkajgiri district, Telangana. It is registered with the Telangana RERA as P02200009514 (status: New Project). The approving authority named in the filing is GHMC (plan approval 2872/GHMC/KPL/2024-BP). The promoter filed a total site area of 3,669 sq m (0.9 acres) and 1 building on the approved plan. The proposed date of completion is 22/01/2028.
Description
Green Pinnacle Block-C is a TG-RERA-filed residential apartment project comprising 75 units in one tower, with five floors on 3,669.42 sq m of land. It is registered as a new project, with proposed completion on 22/01/2028.
- Project type
- Residential (apartment)RERA filing
- Units
- 75RERA filing
- Towers
- 1RERA filing
- Floors
- 5RERA filing
- Land area
- 3669.42 sq mRERA filing
- Possession
- 22/01/2028RERA filing
- Status
- New ProjectRERA filing
Configurations & sizes
For 2BHK homes, carpet area measured from the approved drawings is 61.0–80.5 sq m; verify this measurement against the drawings. The TG-RERA filing records 59 units, none booked, with saleable area of 89.97 sq m. For 3BHK homes, measured carpet area is 83.1–89.1 sq m; verify it against the drawings; the filing records 16 units, none booked, with saleable area of 124.8 sq m.
| Type | Built-up | Saleable | Source |
|---|---|---|---|
| 2BHK | 1,144 - 1,400 sq ft | 89.97 sq m | RERA filing |
| 3BHK | 1,144 - 1,400 sq ft | 124.8 sq m | RERA filing |
| 4 BHK | housing |
Amenities
The disclosed amenities include a receiving station, alongside project infrastructure such as water supply, sewerage, storm-water drainage and rainwater harvesting.
- Receiving Station
Location & connectivity
The project is in Quthbullapur, PIN 500055, in Qutballapur mandal, Medchal-Malkajgiri district.
Promoter
The promoter is KUNA, an individual, and has one other registered project. The named architect is KOTA SIVA PRATHYUSHA and the structural engineer is N VENKAT RAO.
Additional details
Filed vs marketed
The filing gives the locality as QUTHBULLAPUR, while SquareYards markets it as Chintal, Hyderabad; SquareYards also gives a different possession date, and PropTiger’s advertised saleable areas differ from figures shown by other marketing sources.
- Possession: squareyards says 22-Sep-2027; the RERA filing says 22/01/2028. squareyards
- Unit config 2 bhk: proptiger says saleable 1144 sq ft; we show saleable 1141 Square feet. proptiger
- Unit config 3 bhk: proptiger says saleable 1145 sq ft; we show saleable 1399 Square feet. proptiger
- Locality: squareyards says Chintal, Hyderabad; the RERA filing says QUTHBULLAPUR. squareyards
Sources & web results
- Kuna Dinesh Kumar Goud Green Pinnacle Block B in ...housing.com
- Green Pinnacle Block C - Quthbullapur, Hyderabadaurumproptech.in
- ghar.tv
- SSS Green Pinnacle Block A in Quthbullapur, Hyderabadhousing.com
- GREEN PINNACLE BLOCK-C | 2BHK,3BHK | Quthbullapur-1bhumiboss.com
Public RERA registration record
Telangana RERA, as filed by the promoter.
- Registered name
- GREEN PINNACLE BLOCK-C
- Developer / Promoter
- KUNA
- Project type
- Residential
- RERA Registration No.
- P02200009514
- Registration Status
- New Project
- Approved on
- 23/09/2024
- Proposed completion
- 22/01/2028
- Approving authority
- GHMC
- Plan approval no.
- 2872/GHMC/KPL/2024-BP
- Total site area
- 3,669 sq m (0.9 acres)
- Approved built-up area
- 11,138 sq m (2.8 acres)
- Buildings (approved plan)
- 1
- Locality
- QUTHBULLAPUR, Quthbullapur-1
- Mandal
- Qutballapur
- District
- Medchal-Malkajgiri
- PIN code
- 500055
- Documents on File
- 17
Other registrations of Green Pinnacle
Frequently asked questions
Is GREEN PINNACLE BLOCK-C registered with Telangana RERA?
Yes. GREEN PINNACLE BLOCK-C is registered with the Telangana Real Estate Regulatory Authority as P02200009514; the registration status is New Project.
Who is the developer of GREEN PINNACLE BLOCK-C?
The promoter named in the RERA registration is KUNA.
Where is GREEN PINNACLE BLOCK-C located?
GREEN PINNACLE BLOCK-C is in QUTHBULLAPUR, Quthbullapur-1, Qutballapur, Medchal-Malkajgiri, Telangana (500055).
When will GREEN PINNACLE BLOCK-C be completed?
The promoter's proposed date of completion filed with RERA is 22/01/2028. This is the promoter's declaration, not a guarantee.