thePropCheck AI property due diligence
Sign in

Bhavani Elite

Bhavani Elite is a residential project by Sandheera Infratech Private Limited in Mansoorabad Village, Saroornagar, Rangareddy district, Telangana. It is registered with the Telangana RERA as P02400001054 (status: New Project). The approving authority named in the filing is GHMC (plan approval 2/C3/09286/2019). The promoter filed a total site area of 970 sq m (0.2 acres) and 1 building on the approved plan. The proposed date of completion is 17/06/2025.

More from Sandheera Infratech Pvt Ltd · 2 projects →

🔒 Title & legal checks
Title and legal checks are available for this project.
To see the full title details and any court records, please sign in

Description

Bhavani Elite is a residential apartment project with 20 units in one tower, arranged across five floors on 969.76 sq m of land. Its TG-RERA filing lists the project as a new project, with a proposed completion date of 17 June 2025.

Project type
Residential (apartment)RERA filing
Units
20RERA filing
Towers
1RERA filing
Floors
5RERA filing
Land area
969.76 sq mRERA filing
Possession
17/06/2025RERA filing
Status
New ProjectRERA filing
Project photo
Project photo
Developer render
Project photo
Project photo
Project photo

Configurations & sizes

The TG-RERA filing records 3BHK apartments; carpet area measured from the approved drawings is not available because the drawings have not yet been measured, and any area should be verified against the drawings. The filing records 20 units, 19 booked and one available, with a saleable area of 139.36 sq m.

TypeSaleableSource
3BHK139.36 sq mRERA filing
2 BHKnobroker

Amenities

The project’s listed amenities include recreation, fitness, parking and landscaped areas, alongside water, sewerage and rainwater-harvesting infrastructure.

34 amenities · 33 listed
  • Green Strip/TOT LOT/Park
  • covered and mechanical parking
  • Swimming Pool
  • Gymnasium
  • Jogging Track
  • Kids' Play Area
  • Indoor Games Zone
  • Clubhouse
  • Amphitheatre
  • Cricket Nets
  • Community Garden
  • Banquet Hall
  • Landscaped Open Spaces
  • CCTV Surveillance
  • 24/7 Security
  • Power Backup
  • Waste Management System
  • Landscaped Spaces
  • Terrace Amenities
  • Lift Access
  • Security Personnel
  • Designer Common Areas
  • children's play area
  • covered car parking
  • Lift
  • Indoor
  • 24Hrs Backup Electricity
  • landscaped gardens
  • fitness centers
  • indoor play areas
  • children’s activity zones
  • Open Car Parking
  • Closed Car Parking

Specifications

communication system - Internet/Cable
Connection to individual unit through service provider
communication system - Telephone
One point shall be provided in Living Room
doors & windows - Frames
Teakwood frames for all doors , main door frame shall be polished and others shall be painted
doors & windows - French doors
UPVC french door shall be provided with provision for mosquito mesh
doors & windows - Shutters
Main door shall be in solid core flush (Block Board) shutters with panelled decorated veneer with polished/matt finish and internal doors shall be in factory pressed laminate shutters
doors & windows - Windows
UPVC windows with mosquito mesh
electrical
Provision for air-conditioners and essential appliances; power backup for common areas and selected residential requirements
Electrical
Provision for air-conditioners and essential appliances
Electrical
Power backup for common areas and selected residential requirements
flooring - Balcony
300mmx300mm Non slippery Ceramic/Vitrified Flooring
flooring - Bathrooms
300mmx600mm Non slippery Vitrified flooring and daddooing up to false ceiling level
flooring - Corridors & Staircase
Vitrified Tiles/Step Tiles/Granite/Kota stone
flooring - Living, dining, bedrooms & Kitchen
800mmx800mm vitrified tile flooring with appropriate jointing detail
flooring - Parking
Vacuum Dewatered Concrete Flooring
hardware
All hardware shall be brush finished stainless steel , the main door shall be provided with a latch of reputed make. All other doors shall be provided with door bolts and a mortise/tubular/cylindrical lock.
paint - External
Texture / Exterior grade luppam with one coat of primer and two coats of exterior grade acrylic emulsion
paint - Internal
All internal paint with two of luppam , one coat of primer and with two coats of plastic emulsion paint
plastering
18mm Thick double coat waterproof plastering for external walls.
plastering
12mm thick single coat plastering/gyproc/spray plaster/lime render for internal walls
safety & security
CCTV surveillance in common areas; 24/7 security systems
Safety & Security
CCTV surveillance in common areas
Safety & Security
24/7 security systems
sanitary fixture
EWC with Flush Tank , wash basin , one wall mixer and provision for geyser
security system
CCTV Surveillance camera shall be provided in all common areas
structure
RCC framed structure designed for strength, durability, and long-term stability
structure
RCC Framed structure design as per Indian Code
Structure
1 Towers with 20 units
sustainability
Sewage treatment plant, rainwater harvesting provisions, and integrated waste management systems
Sustainability Features
Rainwater harvesting provisions
Sustainability Features
Integrated waste management systems
utilities - Backup Power
100% Backup power upto a limit of 5KVA per unit
utilities - Lift
10 Passenger lift of reputed make upto terrace
utilities - Water Treatment Plant
Treated shall be supplied with water metering

Location & connectivity

The project is in Mansoorabad, Saroornagar mandal, Ranga Reddy district. The developer lists nearby destinations including Geetha High School (5 Min), Manjeera Pyramid School (8 Min), MNR Hospital (12 Min), Aditya Shopping Mall (15 Min) and the Nehru Outer Ring Road access corridor (8 Min).

Mansoorabad, Saroornagar, Ranga Reddy
📍 Open in Maps
Nearby
  • Geetha High School5 Min
  • Manjeera Pyramid School8 Min
  • Mary's Grammar High School5 Min
  • MNR Hospital12 Min
  • Sri Sai Sushrutha Hospital10 Min
  • Max Care Hospital15 Min
  • Aditya Shopping Mall15 Min
  • Nehru Outer Ring Road access corridor8 Min

Promoter

The promoter is SANDHEERA INFRATECH PRIVATE LIMITED, a private limited company with one other registered project. Its official website is sandheera.com; the named architect is LAKSHMI DIVYA Y and the named structural engineer is Y. NARASIMHA RAO.

SANDHEERA INFRATECH PRIVATE LIMITED
1 other project on record
Official website ›Developer site

Additional details

Launched Jun-2019commonfloor
Approvals
GHMC
GHMC Approved
Home-loan tie-ups
  • HDFC
  • ICICI
  • SBI
  • All Leading Bank and Finance

Filed vs marketed

The RERA filing gives a proposed completion date of 17 June 2025, while Commonfloor shows November 2025 and also markets the project as ready to move.

  • Possession: commonfloor says May-2021 (Ready-to-move); we show November 2025. commonfloor

Sources & web results

Fallback
Property portals
Published by third parties — verify before relying on them.

Public RERA registration record

Telangana RERA, as filed by the promoter.

Registered name
BHAVANI ELITE
Developer / Promoter
SANDHEERA INFRATECH PRIVATE LIMITED
Project type
Residential
RERA Registration No.
P02400001054
Registration Status
New Project
Approved on
17/06/2019
Proposed completion
17/06/2025
Approving authority
GHMC
Plan approval no.
2/C3/09286/2019
Total site area
970 sq m (0.2 acres)
Approved built-up area
2,420 sq m (0.6 acres)
Buildings (approved plan)
1
Locality
MANSOORABAD VILLAGE, Mansoorabad
Mandal
Saroornagar
District
Rangareddy
PIN code
500068
Documents on File
14

Frequently asked questions

Is BHAVANI ELITE registered with Telangana RERA?

Yes. BHAVANI ELITE is registered with the Telangana Real Estate Regulatory Authority as P02400001054; the registration status is New Project.

Who is the developer of BHAVANI ELITE?

The promoter named in the RERA registration is SANDHEERA INFRATECH PRIVATE LIMITED.

Where is BHAVANI ELITE located?

BHAVANI ELITE is in MANSOORABAD VILLAGE, Mansoorabad, Saroornagar, Rangareddy, Telangana (500068).

When will BHAVANI ELITE be completed?

The promoter's proposed date of completion filed with RERA is 17/06/2025. This is the promoter's declaration, not a guarantee.

More projects in Mansoorabad