Asr Diamond
Asr Diamond is a residential project by Asr Infra in Makthamahaboobpet, Serilingampally, Rangareddy district, Telangana. It is registered with the Telangana RERA as P02400004894 (status: New Project). The approving authority named in the filing is GHMC (plan approval 2/C21/00039/2022). The promoter filed a total site area of 669 sq m (0.2 acres) and 1 building on the approved plan. The proposed date of completion is 12/01/2028.
Description
ASR DIAMOND is a residential apartment project recorded as a New Project with TG-RERA. The filing lists 20 units in one tower, five floors and a land area of 669.04 sq m, with completion proposed for 12 January 2028.
- Project type
- Residential (apartment)RERA filing
- Units
- 20RERA filing
- Towers
- 1RERA filing
- Floors
- 5RERA filing
- Land area
- 669.04 sq mRERA filing
- Possession
- 12/01/2028RERA filing
- Status
- New ProjectRERA filing
Configurations & sizes
For the 2BHK configuration, carpet area measured from the approved floor-plan drawings ranges from 53.0 to 57.1 sq m (median 56.5 sq m); these are drawing measurements, not RERA disclosures, and should be verified against the drawing. The TG-RERA filing records 20 units, 10 booked, and saleable area of 97.55 sq m.
| Type | Carpet | Saleable | Source |
|---|---|---|---|
| 2BHK | 97.55 sq m | RERA filing | |
| unit | 1,050 sqft | housing |
Amenities
Disclosed project amenities include park and landscape features, water and sewerage infrastructure, rainwater harvesting, and closed car parking.
- Green Strip/TOT LOT/Park
- Park
- RO Water System
- Fire Fighting Equipment
- Closed Car Parking
- Meter Room
- Landscape Garden and Tree Planting
Location & connectivity
The project is listed at Survey No. 44/4, Plot 84, Makutha, Serilingampally, Ranga Reddy district. Nearby listings include Lingampalli Railway Station (1.0 Km), University Of Hyderabad (2.1 Km), and Sujana Vidya Nikethan (2.9 Km).
- University Of Hyderabad2.1 Km
- Sujana Vidya Nikethan2.9 Km
- Lingampalli Railway Station1.0 Km
Promoter
The promoter is ASR INFRA, a partnership, and its official website is https://www.asrindiaprojects.com/asr-india-diamond-city-saidapur-yadadri/. The named architect is Rajesh Popuru and the structural engineer is Giddalur Loknath.
Additional details
Filed vs marketed
The TG-RERA filing records a land area of 669.04 sq m, while the developer's marketing shows 647 sq m; the marketing also gives a launch date of 01 January 2022, whereas another marketed listing says Aug'22.
- Land area: proptiger says 0.16 Acres; we show 647 Sq-m. proptiger
- Launch: proptiger says Aug'22; we show 01 January 2022. proptiger
Sources & web results
- ASR Diamond in Serilingampally, Hyderabadmagicbricks.com
- proptiger.com
- ASR DIAMOND Medchal-Malkajgiri – RERA No. ...aurumproptech.in
- ASR DIAMONDbhumiboss.com
- ASR Diamond Amenities Serilingampally, Hyderabadmagicbricks.com
- Asr Diamond FAQs - Serilingampally, Hyderabad99acres.com
- westsiderealty.in
Public RERA registration record
Telangana RERA, as filed by the promoter.
- Registered name
- ASR DIAMOND
- Developer / Promoter
- ASR INFRA
- Project type
- Residential
- RERA Registration No.
- P02400004894
- Registration Status
- New Project
- Approved on
- 12/01/2022
- Proposed completion
- 12/01/2028
- Approving authority
- GHMC
- Plan approval no.
- 2/C21/00039/2022
- Total site area
- 669 sq m (0.2 acres)
- Approved built-up area
- 1,570 sq m (0.4 acres)
- Buildings (approved plan)
- 1
- Locality
- MAKTHAMAHABOOBPET, Makutha
- Mandal
- Serilingampally
- District
- Rangareddy
- PIN code
- 500049
- Documents on File
- 19
Frequently asked questions
Is ASR DIAMOND registered with Telangana RERA?
Yes. ASR DIAMOND is registered with the Telangana Real Estate Regulatory Authority as P02400004894; the registration status is New Project.
Who is the developer of ASR DIAMOND?
The promoter named in the RERA registration is ASR INFRA.
Where is ASR DIAMOND located?
ASR DIAMOND is in MAKTHAMAHABOOBPET, Makutha, Serilingampally, Rangareddy, Telangana (500049).
When will ASR DIAMOND be completed?
The promoter's proposed date of completion filed with RERA is 12/01/2028. This is the promoter's declaration, not a guarantee.