Mailikas Murari
Mailikas Murari is a residential project by Mailika Infra Projects Private Limited in Pragathi Colony, Rajendranagar, Rangareddy district, Telangana. It is registered with the Telangana RERA as P02400000749 (status: On-Going Project). The approving authority named in the filing is GHMC (plan approval 1/C6/05662/2017). The promoter filed a total site area of 836 sq m (0.2 acres) and 1 building on the approved plan. The proposed date of completion is 21/06/2023.
More from Mailika Infra Projects Pvt Ltd · 4 projects →
Description
Mailikas Murari is a residential apartment project on 836 sq m of land, with 20 units in one tower across five floors. The TG-RERA filing lists it as an ongoing project, with a proposed completion date of 21/06/2023.
- Project type
- Residential (apartment)RERA filing
- Units
- 20RERA filing
- Towers
- 1RERA filing
- Floors
- 5RERA filing
- Land area
- 836 sq mRERA filing
- Possession
- 21/06/2023RERA filing
- Status
- On-Going ProjectRERA filing
Gallery


Configurations & sizes
The 2BHK carpet area measured from the approved floor-plan drawings ranges from 45.4 to 50.4 sq m; this is a drawing-based measurement, not a RERA disclosure, and should be verified against the drawings. The TG-RERA filing records 20 units, 0 booked, and a saleable area of 89.35 sq m.
| Type | Saleable | Source |
|---|---|---|
| 2BHK | 89.35 sq m | RERA filing |
Amenities
The disclosed amenities and infrastructure include green space, security, water and sewerage services, and recreation and building services.
- Green Strip/TOT LOT/Park
- Security 24x7
- Power Backup 24x7
- Kids' Play Areas / Sand Pits
- Power Backup
- Lift
- 24 x 7 Security
- Normal Park / Central Green
- Indoor Games
- Security
- Waste Management
- CCTV Camera
- swimming pool
- gym
- children's play area
- clubhouse
- covered car parking
Specifications
- flooring
- Vitrified Tiles
- master bedroom walls
- Oil Bound Distemper
- structure
- RCC Frame Structure
Location & connectivity
The project is in Mailardevpally, Rajendranagar mandal, Ranga Reddy district, Hyderabad. SquareYards lists Krishnaveni Talent School 0.3 km away, Zoo Logical Park 3.1 km away, and Sri Raghavendra Hospital 0.1 km away.
- Krishnaveni Talent School0.3 km
- Zoo Logical Park3.1 km
- Sri Raghavendra Hospital0.1 km
Promoter
The promoter is MAILIKA INFRA PROJECTS PRIVATE LIMITED, a private limited company; its RERA filing indicates past experience and three other registered projects. The named architect is K.RAVI, and the named structural engineer is SATYAPRAKASH S LOKARE.
Additional details
- HDFC
- ICICI
- SBI
Sources & web results
- MAILIKAS MURARI Hyderabad – RERA No. P02400000749aurumproptech.in
- MAILIKAS MURARIbhumiboss.com
- Mailikas Murari Photos – Images & Gallerynobroker.in
- MAILIKAS MURARI (Telangana) Report & Status | Real Estate Reportsrealestatereports.in
Public RERA registration record
Telangana RERA, as filed by the promoter.
- Registered name
- MAILIKAS MURARI
- Developer / Promoter
- MAILIKA INFRA PROJECTS PRIVATE LIMITED
- Project type
- Residential
- RERA Registration No.
- P02400000749
- Registration Status
- On-Going Project
- Approved on
- 21/06/2017
- Proposed completion
- 21/06/2023
- Approving authority
- GHMC
- Plan approval no.
- 1/C6/05662/2017
- Total site area
- 836 sq m (0.2 acres)
- Approved built-up area
- 2,410 sq m (0.6 acres)
- Buildings (approved plan)
- 1
- Locality
- PRAGATHI COLONY, Mailardevpally
- Mandal
- Rajendranagar
- District
- Rangareddy
- PIN code
- 500005
- Documents on File
- 13
Frequently asked questions
Is MAILIKAS MURARI registered with Telangana RERA?
Yes. MAILIKAS MURARI is registered with the Telangana Real Estate Regulatory Authority as P02400000749; the registration status is On-Going Project.
Who is the developer of MAILIKAS MURARI?
The promoter named in the RERA registration is MAILIKA INFRA PROJECTS PRIVATE LIMITED.
Where is MAILIKAS MURARI located?
MAILIKAS MURARI is in PRAGATHI COLONY, Mailardevpally, Rajendranagar, Rangareddy, Telangana (500005).
When will MAILIKAS MURARI be completed?
The promoter's proposed date of completion filed with RERA is 21/06/2023. This is the promoter's declaration, not a guarantee.